REDEVELOPMENT PROJECTS
 

1. Preparation of Feasibility Report:
A feasibility report shall be prepared by studying the plan, by applying the FSI & TDR rules, considering maximum benefits the member can demand from the developers, A report will be submitted by the society.

2. Preparation of Tender for Redevelopment:
Preparation of Tender document, "Tender" is a crucial document, which is to be designed meticulously to avoid any kind of misunderstanding/argument during the course of project. It shall contain an agreement, various information's to bidder, technical specifications, general conditions, and detailed specifications. And only reputed builders are invited for the project bid.x

3. Selection of Developer:
After detailed study of various bids, considering technical and commercial angle a bid comparison chart is prepared with our recommendations. We shall assist in short-listing some developers for interview and negotiations and over mutually acceptable developer is finally selected to carry out proposed work.

4. Project Planning:
After placing of work order the developer is asked to prepare a detail work schedule and the entire project is planned with dead lines.

5. Verifications:
In most of the projects developer/builder shows some plans to the society and gets approved different plan; so afterwards society is left on the mercy of BMC officials. As a project management company, we would verify the plans of building prepared by the developers for the society members in respect of planning, area calculations, legalization and authorization of the area allotted to the members. Any alteration in the plans of society building prepared by builder should be to the satisfaction of society members.

6. Quality controls:
A regular visit of a project manager is arranged 3-4 times a week. Maximum emphasis is given on the quality of the constructions to avoid recurring expensive repairs afterwards. As a project management consultant we would supervise the quality of constructions and verify the structural plan, necessary instructions/specifications shall be issued to contractor as per the requirements of the structure to have long lasting durability.

7. Inspections:
Inspecting whether the work is carried out as per approved plans and as per commitments made by the developer with the society and whether all the necessary approvals are obtained by builders at every stage of the works.

We are committed to give best services to our clients.

   